Confirm the structural role
Identify what the pylon supports, its storey position, connected slabs or beams and the design revision used on site. A similar-looking element may carry a different force combination.

A reinforced-concrete pylon is a vertical load-bearing element whose cross-section is elongated in plan. Its reinforcement cannot be selected from a universal table: the structural engineer defines the cage from the load path, geometry, material properties, stability, joints, openings and the building-specific design model.
Before concreting, compare the installed cage with the issued structural drawings and specifications. Check bar marks and layout, ties, laps or mechanical connections, anchorage, concrete cover, spacers, embedments, openings, cleanliness and the inspection record. Any change requires the designer’s decision.

Identify what the pylon supports, its storey position, connected slabs or beams and the design revision used on site. A similar-looking element may carry a different force combination.
Use the current drawings, schedules and details for longitudinal bars, transverse reinforcement, confinement zones, anchorage and joints. Do not infer missing dimensions from another pylon.
Confirm section geometry, position, construction joints, openings, sleeves, embedments and connections to slabs, walls and foundations before closing the formwork.
Keep the cage in its designed position during installation and concreting. Temporary stability, access for concrete placement and congestion at joints must be resolved before the pour.
Check the specified connection type, location and preparation. Substituting a lap, coupler or bar arrangement changes the force-transfer detail and requires structural approval.
Use the specified spacers and verify clear distances to formwork and embedded parts. Cover is a project requirement linked to durability, fire and bond; it is not a cosmetic dimension.
Photograph key zones, close the inspection checklist, record approved deviations and confirm that reinforcement and formwork are clean and ready for concrete placement.
There is no universal diameter. It follows from structural calculations, section geometry, forces, materials, detailing rules and the whole building system. The issued project documentation is the controlling source.
Storey count alone is insufficient. Spans, loads, stability system, eccentricity, openings, foundations and material properties change the design. Preliminary dimensions must be checked in the structural model.
A site team should not change bar sizes, spacing, connections or anchorage without an approved designer decision. A seemingly local change can affect capacity, crack control and force transfer.
STMK publishes R04 as a residence with a monolithic reinforced-concrete frame and a cantilever. The construction page describes coordination of design and site control for responsible concrete structures. These sources show the context of the work; they do not replace the structural documentation for a specific pylon.
This guide is educational and intentionally gives no universal bar diameters, spacing, laps or section sizes. Those values must come from the project and applicable requirements.