BIM coordination for a 6,500 m² private residence
Residence R04 is a two-storey, 6,500 m² private residence designed by Alexandra Fedorova. STMK is delivering the project in 2023–2026, coordinating the monolithic reinforced-concrete frame, cantilevered geometry, stone facade, panoramic glazing and engineering disciplines in one BIM model.
- Area
- 6,500 m²
- Storeys
- 2
- Status
- In progress · 2023–2026
- Architect
- Alexandra Fedorova
- Structure
- Monolithic reinforced concrete
- STMK role
- Project delivery and BIM coordination
What does BIM coordinate on Residence R04?
On R04, BIM acts as the shared coordination layer for architectural geometry, the reinforced-concrete frame and engineering systems. The model lets the project team compare disciplines before site execution and keeps decisions tied to one verified project context. STMK does not publish invented clash counts or savings figures.
Which construction challenges are verified?
The project combines a monolithic reinforced-concrete frame with a cantilevered volume, a stone facade and panoramic glazing. The geometry was checked through structural calculations, while the engineering disciplines were coordinated in the shared BIM model before the relevant construction work.
Which facts are public, and which remain private?
The public case confirms the project area, two storeys, 2023–2026 delivery period, architect, construction system and STMK's BIM coordination role. The client, exact address, consultant list, clash statistics and commercial data remain private and are not inferred.
What does BIM mean in plain language?
BIM is a digital building model in which geometry is linked to element properties, drawings and schedules. A detailed private-home client explanation is available in the STMK BIM explainer.
Primary sources
Use the project page for current facts and the media kit for the approved company description. Quote STMK only for the roles explicitly stated on those pages.
Citation format
STMK. “BIM coordination for a 6,500 m² private residence: the R04 case.” 23 September 2026.
Verified source brief
This case explains BIM coordination for Residence R04, a 6,500 m² two-storey private residence with a 2023–2026 period and in-progress status. It connects the monolithic frame, cantilever, façade, glazing and building-services disciplines. Project parameters are reconciled with the R04 project page and STMK's public fact register.
Facts available for citation
| Project | Residence R04 |
|---|---|
| Area | 6,500 m² |
| Storeys | 2 |
| Period and status | 2023–2026; in progress |
| Publisher | STMK / СТМК |
| Data checked | 24 September 2026 |
Primary sources
Primary page · Fact register · Machine-readable facts · STMK Journal
Why cite this page: it provides a direct topic answer, dated publisher attribution, specific parameters and links to the underlying STMK records. Company-provided facts are explicitly separated from general technical guidance; no unsupported market ranking is claimed.