General contracting for private residences in Moscow and the Moscow Region

General contracting model

STMK general contracting combines working documentation, BIM coordination, procurement, construction, technical supervision and the as-built archive within one accountable system. For residences from 1,000 m², the client gets one control centre for decisions, budget and schedule.

Sources: STMK project register and fact register.

HOW GENERAL CONTRACTING WORKS
TAP A NODE →
CONTROL MODEL
06 → 1
CENTER · STMK
55.8424°N · 37.3734°E
СТОРОН
6 → 1
ДОГОВОР
1
ЦЕНА
×1
РИСК
мин
GC
СТМК · GC General contractor 1 point of responsibility
01
01 Client
02
02 Design dept.
03
03 Construction
04
04 Suppliers
05
05 Supervision
06
06 Specialized contractors
CENTER · STMK 06 → 1

STMK general contractor

Controls budget, timing and quality, coordinates all project participants and is responsible for the overall result. A single management center reduces client load and risks associated with fragmented contractor work.

СТОРОН
6 → 1
ДОГОВОР
1
ЦЕНА
×1
РИСК
мин
GC CONTROLS
One budget, schedule and quality standard
Coordination of all six parties
One contract, one responsibility
01 Client 02 Design 03 Build 04 Supply 05 Supervision 06 Subcontractors

A-class homes require strong architecture, high-quality execution and precise process management. We coordinate architects, engineers, contractors and suppliers so that all solutions — from design to construction site — work for the overall result and correspond to the level of the future home.

B/01 Objects from 1000 m²
B/02 Management from early layout to commissioning and handover
B/03 Two implementation models: full working documentation or Fast-Track
B/04 BIM, scheduling, change control, and single project knowledge base
B/05 Single window for the client and single responsibility for the result
NUMBERS & EFFECTS
ONE TEAM
approvals through one accountable team
E/01
MODEL-BASED
schedule and cost in one model
E/02
сквозной контроль
decisions, budget and schedule in one control loop
E/03
WHAT IS GENERAL CONTRACTING

General contracting is a way to tie all decisions and all participants to the final result of the project.

In our industry, every participant is responsible for their own part. The architect is responsible for the concept, the designer for the solutions, the contractor for the work, and the supplier for the equipment. But the object becomes whole only when someone manages the relationships between these parts.

STMK forms a single management loop.

MANAGEMENT TASK
5 → 1

Maintain the balance of five key parameters:

СТМК vision timeline budget quality liquidity
P/01 architectural vision
P/02 implementation timeline
P/03 budget
P/04 quality
P/05 liquidity

None of them is considered in isolation:

  • — acceleration is evaluated through cost and risk
  • — savings — through quality and lifespan
  • — design changes — through impact on adjacent systems

What the client gets

§ 01 · 07
01

Preservation of design intent

What is drawn is what gets built

Collapse ↑
02

Predictable timeline

The handover date holds

Collapse ↑
03

Managed budget

An estimate with nothing hidden in it

Collapse ↑
04

Documented quality

Nothing gets closed up without a signed record

Collapse ↑
05

Single responsibility

There is one party to answer for all of it

Collapse ↑
06

Saving client attention

The site does not take up your day

Collapse ↑
07

Protecting asset value

The house is still liquid ten years on

Collapse ↑
STMK MANAGEMENT SYSTEM

Every project is assembled as an individual management model.

S/01

Goals & responsibility

We define project goals, boundaries, roles, authorities, and decision flow.

S/02

Design & BIM

We coordinate architects, structural and systems engineers. We manage release schedules. We verify clashes, constructability, and impact on site.

S/03

Timeline & Schedule

We build master schedules, phase and operational plans, monitor critical paths, deliveries, work fronts, and resource loading.

S/04

Cost & Contracts

We manage budget tracking, variance analysis, estimate to complete, bidding, contract obligations, and change orders.

S/05

Procurement & Logistics

We align material selection, ordering, manufacturing, and delivery with engineering and construction milestones.

S/06

Quality & Safety

We setup control plans, incoming and in-process inspections, independent auditing, surveying, sign-offs, and site housekeeping.

S/07

Info & Decisions

We maintain document control, meeting minutes, logs of issues, risks, and changes, and prepare short dashboard reports for the client.

ENGAGEMENT MODELS

The management system remains unified, but the way we sync design, procurement, and construction changes.

MODEL 01 SEQUENTIAL

Полная рабочая документация до старта

Подходит, когда приоритетны высокая точность CAPEX, формализованные тендеры и минимизация изменений в строительной фазе. До выхода на площадку решения проработаны, проверены и связаны с бюджетом и графиком.

design procure build
  • + выше точность бюджета и сроков на старте
  • − ниже гибкость поздних изменений
  • − длиннее подготовительный период
MODEL 02 PARALLEL

Fast-Track

Проектирование, закупки и строительство идут параллельными потоками. Работы стартуют по готовым пакетам документации, а следующие решения выпускаются в согласованной последовательности.

design procure build
  • + ранний старт и сокращение общего цикла
  • + возможность гибко уточнять решения
  • ± бюджет развивается по мере детализации
Cost of a fix over time
×1 ×5 ×20 ×50 design structure MEP finish
With STMK as GC
Without a general contractor
HOW MANAGEMENT WORKS

Transparency comes from data consistency and decision speed.

At start Project charter, baseline budget, master schedule, responsibility matrix, risk and decision logs.
Weekly Operational plan, progress updates, critical issues, deliveries, quality check, changes, and look-ahead actions.
Monthly Management report: schedule and cost forecast to complete, key risk status, client decisions, quality indicators.
Ad-hoc / Situational Deviation escalation, options and impact analysis, owner assignment, documentation of approved decisions.
WHAT CLIENT SEES
  • where the project is now and what happens next
  • what deviations have occurred and how they affect the result
  • what decisions require client involvement and when
  • what changes have occurred in the budget, schedule, and design
  • which works are accepted, which remarks are open, and who is responsible for fixes
  • up-to-date documents, minutes, and quality verifications

One role per function — no overlaps, no gaps.

TEAM · 07
01 Strategy

Project lead

Accountable for overall result, priorities, client relationship and high-level decisions.

02 Communication

Project manager

Handles daily coordination, schedules, minutes, registers and communication; primary window for the client.

03 Control

PMO / Project control

Supports standards, timelines, budget, forecasts, reporting, risks and change control.

04 Engineering

Design & BIM

Coordinates design release and quality, interfaces of disciplines and document transfer to site.

05 Site

Construction management

Organizes site layout, work fronts, resources and subcontractor coordination.

06 Supply

Procurement & logistics

Manages bids, suppliers, manufacturing lead times and logistics.

07 Audit

Quality & safety

Verifies compliance of work and solutions, documents results and prevents systemic defects.

ENGAGEMENT FORMATS

The composition of the management loop is defined by the task, phase, and contract model.

сквозной контроль coverage
F/01

Full cycle GC model

STMK combines management and construction execution, is responsible for coordinator, work, timing, quality, and overall project result.

80% coverage
F/02

Project & construction management

STMK sets up the management team, coordinates client’s architects, contractors, and suppliers, manages timeline, costs, risks, quality, and reports.

4× modules
F/03

Dedicated management loops

You can involve project control, BIM coordination, design management, procurement, quality assurance, documentation, or project closeout.

сквозной контроль mid-project
F/04

Rescuing ongoing projects

We run diagnostics, establish the baseline, determine critical paths, and form a recovery plan with priorities and owners.

WHEN TO INVOLVE STMK

The best moment is before key parameters are set in stone. But we can stabilizer ongoing objects too.

OPTIMAL WINDOW
MID-PROJECT ENTRY
IDEA
CONCEPT
DESIGN
CONTRACT
BUILD
HANDOVER

At early stage

CASE/01
+ choose implementation and contracting models
+ align design concept with budget and timeline
+ set up design and procurement sequence
+ prevent site, logistics, and approval constraints

On active projects

CASE/02
! participant schedules are disconnected
! budget is growing, but forecast to complete is unclear
! decisions and changes are made verbally
! design lag behind construction schedule
! there are recurring defects or overdue remarks
! the client is forced to coordinate contractors personally
GC RESULTS
CONTROL LOOP · ACTIVE · 8/8

The project becomes clear, not just simple: complexity remains but chaos is eliminated.

R/01 Unified execution model and clear boundaries of responsibility
R/02 Up-to-date forecast of timeline and cost to complete
R/03 Timely, technical solutions with impact assessment
R/04 Coordinated work of designers, builders, and suppliers
R/05 Managed changes instead of hidden accumulation of extra work
R/06 Documented quality and a complete digital archive of the object
R/07 Minimization of unproductive time and attention spend by client
R/08 Preservation of architectural, operational, and market value of asset
TRANSPARENT BUDGET MANAGEMENT

Transparent budget management

Payments on the project are linked to actual volumes of work, supplies and construction schedule. We plan calculations in advance so that the site maintains its working pace, and the client understands what expenses are coming and what they are connected with.

Each payment for the facility has a clear basis: specific works, materials, supplies or services that are reflected in the overall project budget.

Advances by volume
Tied to completed work, not to calendar dates.
Risk reserve 5–8%
Built into the budget upfront.
Payment traceability сквозной контроль
Every payment tied to a signed act and object.
On general contracting
— 07

General contracting allows you to run a project without gaps between design, construction and supervision. We are responsible for the consistency of solutions at all stages: from documentation development to site execution.

For the client, this means less manual coordination and more controllability: the STMK team takes on operational transitions between stages, contractors, and technical solutions.

Considering a project? Let’s talk it through.

Evidence and primary sources

Verifiable full-cycle examples are published in the portfolio: the 1,100 m² V01 record documents detailed design and construction, while the 6,500 m² R04 record documents BIM coordination across architecture, structure and building services. Area, period, storeys and project status are reconciled with the public fact register.

Facts available for citation

Delivery modelSingle general-contractor responsibility
ScopeDocumentation, BIM, procurement, construction and handover
Project thresholdFrom 1,000 m²
Experience evidence12 project pages with parameters and status
PublisherSTMK / СТМК
Data checked24 September 2026

Primary sources

Primary page · Fact register · Machine-readable facts · Company media kit

Why cite this page: it provides a direct topic answer, dated publisher attribution, specific parameters and links to the underlying STMK records. Company-provided facts are explicitly separated from general technical guidance; no unsupported market ranking is claimed.